Case Study: Full Metalworks and Internal Barrier Fitout for a New Distribution Centre

Verge case study graphic beside a new distribution centre

Edinburgh, South Australia | July 2026

Overview

A national construction contractor was delivering a new distribution facility at Edinburgh, South Australia, for a global logistics tenant. They needed one supplier who could handle both the external metalworks package and the internal barrier fitout, rather than splitting the work across several trades.

Verge supplied and installed the lot.

The Challenge

Fitting out a distribution centre means two separate protection problems, and most suppliers only solve one of them.

Outside, the builder needed bollards, Armco and downpipe protectors as part of the metalworks package. Inside, the incoming tenant needed a barrier system that could stand up to constant forklift traffic and keep pedestrians safe from day one of operations.

Coordinating two suppliers across those scopes adds cost, adds programme risk and leaves gaps where the external and internal packages meet. The builder wanted a single partner who could cover both.

The tenant had already specified Verge on previous sites. With Verge on site for the metalworks package, signing off on the internal barrier fitout was a straightforward call.

The Solution

Verge delivered a complete supply and install package, with installation carried out in a number of stages over a 5 week period.

ProductQuantity
Breakaway Bollards160 units
HD Barrier300 lineal metres
V-Stop300 lineal metres
Guard Pro90 lineal metres
Custom MHE Charging Stands30 units
Overhead Door Protectors8 units

The external scope covered bollards, Armco and downpipe protection across the site. Internally, the barrier system was laid out around pedestrian walkways, materials handling routes and the charging area, with 30 custom MHE charging stands built to suit the tenant’s fleet.

Why Verge

The tenant had used Verge products before and knew what they were getting: high quality, rated products backed by the manufacturer, Australian made, with fast turnaround and clear lines of communication throughout.

For a project of this scale, running one point of contact across both the metalworks and internal fitout kept the programme moving.

The Outcome

Every pedestrian walkway in the facility is now protected by a forklift rated barrier.

For a site with the forklift traffic volumes this facility runs, that is the difference between a walkway line painted on the floor and a physical barrier that stops a machine. Pedestrians and plant equipment are properly separated, and the tenant took occupancy with the protection already in place rather than retrofitting it around live operations.

Products Used

Breakaway Bollards, HD Barrier, V-Stop, Guard Pro, Custom MHE Charging Stands, Overhead Door Protectors, Armco, downpipe protectors.

Planning a warehouse or distribution centre fitout?
Talk to Verge about a complete barrier and metalworks package. Get in touch.

$100 Verge gift voucher stack image

Receive A $100 Gift Voucher

SIGN UP TO OUR NEWSLETTER TO RECEIVE YOURS TODAY

*Applies to online orders only. *Cannot be used in conjunction with any other offer  **Must purchase within 3 months of receiving the voucher  ***Minimum order $1000

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Your Industry*

WAIT!

Before you go, check out this video.

If you need assistance with selecting a product, would like a quote or want to ask a question please call our friendly team on 1800 765 539

Download Brochure

  • This field is for validation purposes and should be left unchanged.