Case Study: Martin Brower Distribution Centre

At Verge Safety Barriers, we recently partnered with Vaughan Constructions to elevate safety standards at the new Martin Brower Distribution Centre in Brisbane. As a leading supply chain provider for fast food restaurants, our client required a solution to effectively manage high volumes of vehicle and MHE traffic across their facility and ensure pedestrians were safely segregated at all times!

Verge was chosen as the preferred provider due to our ability to supply and install quality Australian Made safety barrier solutions which are tested and rated to meet current industry standards!

Key highlights of the installation include:

Verge HD Barriers: 122 linear metres
HD Barrier was used to protect all internal pedestrian walkways.
Verge Double Guard-Pro: 155 linear metres

Double Guard-Pro was selected for asset protection to external boundaries, car park assets and heavy vehicle traffic areas.
Verge V-Gates: 20 units

Our V-Gates were installed to optimise pedestrian safety in all pedestrian/MHE cross-over areas.
Steel Overhead Door Protectors: 18 units

All internal rapid doors were protected with heavy duty door protection to maximise asset lifespan.

The team at Verge were pleased to work another global supply chain powerhouse and our ongoing partnership with Vaughan Constructions QLD resulted in a satisfactory result for all parties. We look forward to continuing this successful partnership!

Looking for a partner for all-things-safety for your next facility?? Talk to the team at Verge today!

  • This field is for validation purposes and should be left unchanged.

WAIT!

Before you go, check out this video.

If you need assistance with selecting a product, would like a quote or want to ask a question please call our friendly team on 1800 765 539

Download Brochure

  • This field is for validation purposes and should be left unchanged.