The Project

Nisbets moved into a new Factory. There was a small amount of HD Barrier on site at their arrival. There were a lot of unprotected areas that needed barriers.

Case Study – Nisbets »

Summary of works

Verge proposed extra barriers, boom gates for the dock areas and column protectors where forklifts were near unprotected columns

The problem

The busy dock areas was all open

Case Study – Nisbets »

The solution

By providing designated walkways protected by physical barriers and controlled at intersections by gates, the risk of collisions is greatly reduced. Everyone knows the path to take and the forklift drivers know exactly where pedestrians will be crossing, removing all surprises. Everyone is now kept safe.

Nisbets are very proactive regarding safety. This is the second facility protected with Verge solutions

  • This field is for validation purposes and should be left unchanged.

WAIT!

Before you go, check out this video.

If you need assistance with selecting a product, would like a quote or want to ask a question please call our friendly team on 1800 765 539

Download Brochure

  • This field is for validation purposes and should be left unchanged.